| Celeste Progress for May 2011 |
Apartment Numbers |
Central driveway |
Common transformer |
DG set |
East elevation |
Fire alarm system |
fire hose reel box |
floor markings |
Interlock paving |
Landscaping |
Lift door |
Lift facade |
Main door polished |
Manual call point |
Metering panel |
North elevation |
panel |
passage |
paving for driveways |
preparatory works for polishing |
roof sheeting |
sanitary fittings |
solar array |
solar panel array |
View from kitchen window |
| Celeste Progress for April 2011 |
View basement parking |
View terrace sheeting |
Bedroom window |
Close up of elevation |
Closer view-north elevation |
Concreted basement parking area |
East elevation |
final touch up |
Finished staircase walls |
Fire fighting works |
Flooring completed for terrace |
Hardware for main door |
Lift controller |
Lift machine |
Lift panel |
lift work in progress |
Lower basement |
Main door polished |
Main door polished |
North elevation |
Parking ceiling finishes |
Solar panels in positiong |
Solar tanks in position |
Staircase to lift machine room |
Switches |
Switches in position |
Terrace sheeting works |
|
| Celeste Progress for March 2011 |
Truss works View |
Carpentry |
Central atrium duct |
East elevation painted |
Finishing of door frames |
French doors |
Internal finishes |
Internal painting |
Lift machine room with water tank |
Light check for painting work |
Lock fixing in progress |
Lock for main door |
Main door lock |
North elevation-painted |
Northwest elevation |
Passage tiling |
Staircase tiles and railing |
staircase to lift machine room |
Terrace truss works |
Truss works west side |
| Celeste Progress for Febraury 2011 |
Central light duct railing |
Compound wall |
Gas lines |
Internal puttied walls |
JOINERY WORKS |
Painted external surface |
Puuty works completed |
Railing works |
Rear Elevation |
Truss |
Truss painting |
Truss works |
View of the curved truss works |
Slab work in progress |
Slab work in progress |
Slab work in progress |
| Celeste Progress for January 2011 |
Basement plastering |
Carpentry works in progress |
Central skylite railing |
Color sampling for external walls |
Door shutters |
East elevation |
Fire fighting |
North elevation |
Pergola plastering |
Puttied walls |
Sanitary lines |
Sanitary lines |
Truss works |
Truss works at terrace |
Window shutters |
|