| Iris Progress for August 2011 |
Aluminium works |
Basement concrete |
Car park concrete |
Corridor lighting |
Aluminum work |
Duct lines |
Duct paintings |
False ceiling in toilets |
Kitchen platform with tiling |
Lift installation |
Main door polish |
Panel room |
Plumbing lines in terrace |
Sanitary ware |
Side and front view |
Side elevation |
Switches |
Toilet dado |
View of corridor |
|
| Iris Progress for July 2011 |
Basement ceiling painting |
Basement ceiling plaster |
Beautification works |
Corridor putty works |
Corridor tiling |
Duct painting |
Elevation -closeup front & side |
Granite platform |
Hardware for doors |
Internal painting |
Kitchen grill fixing |
Main door -teak veenered |
Side elevation |
Staircase railing |
|
|
Iris Progress for June 2011 |
balcony railing |
basement plastering |
bedroom window |
Carpentry work |
Compound wall |
Duct plastering |
Elevation close up view |
External paint primer |
Granite paltform with sink |
Granite platform |
Painting works |
Puttied wall surface |
Side elevation |
Terrace floor |
Window railings |
|
Iris Progress for May 2011 |
Balcony railing |
Brick cladding for elevation |
Ceiling putty work |
Compound wall |
Elevation beautification |
External painting |
External plastering |
flooring |
Iris front view |
Internal putty work |
Kitchen platform & flooring |
Roof sheeting with skylite |
Side elevation |
Terrace sheeting works |
|
|
| Iris Progress for April 2011 |
View roof sheeting |
Close up eastern view |
Completed roof sheeting |
corridor & duct plaster |
Work In Progress |
Work In Progress |
Work In Progress |
Work In Progress |
East elevation |
Eastern view |
External plaster in progress |
Front view |
External plaster with elevational |
featuresMain door frames in position |
Roof sheeting profile |
skylite |
solar panels in position |
Solar panels |
solar tanks |
tiling in progress |
western elevation |
|
|
|
| Iris Progress for March 2011 |
View truss works |
Balcony grill fixing |
Bedroom windows with grills |
Curved truss |
Duct plaster |
East elevation |
External plastering south side |
Grills for windows |
Kitchen platform with grills |
Lift machine room and water tank plaster |
Main door BST shutter |
North East elevation |
Passage ceiling plaster |
Passage plaster |
Plastering in progress |
Puttied internal walls |
Puttied walls |
Sand seiving |
Tiling in kitchens |
Tiling work in progress |
Toilet tiling |
Side elevation |
Truss works |
Western elevation ext plaster |
| Iris Progress for Febraury 2011 |
Ceiling plaster in corridors |
Chasing work for electrical conduits |
Front elevation |
Grills for windows |
Grills painting |
Internal plastering for walls |
Kitchen grills |
Living room |
Masonary for ducts at terrace |
Puutied walls for sample flat |
Roof Truss works |
Sand cleaning operation |
Sand seiving machine |
Side elevation |
Tiles stock |
Tiling for sample flat |
| Iris Progress for Janaury 2011 |
Safety precautions |
Plastering mesh work |
Metal boxes |
Mesh work between different materials |
Lintels in position |
Decking for terrace slab |
Lintels in position |
Latrite masonary work |
conduits |
concreting terrace slab |
Blockwork |
|